As part of the accessibility programme for persons with reduced mobility (PRM) at Mâcon-Ville railway station, GTA Coatings recoated and provided long-lasting protection for the overhead line supports and gantries on the platforms.
Located on the Paris–Lyon main line at kilometre point 439, the station comprises a passenger building and three operational platforms serving several tracks. The works therefore had to be carried out in a particularly constrained railway environment, directly above and adjacent to live tracks.
The works combined manual surface preparation, treatment of legacy coatings, encapsulation of sound existing layers, application of a corrosion protection system and a signal grey RAL 7042 finish. Interventions took place at night, during temporary track possessions and with the overhead line equipment (OLE) isolated.
The possible presence of lead in the legacy coatings required a specific procedure: protection of the work areas, waste recovery, suitable personal protective equipment (PPE) and a decontamination unit. GTA Coatings thus refurbished the structures in compliance with railway, environmental and occupational health requirements.